Public Works
453 fees and rates.
| Fee | Division / category | Price | Notes |
|---|---|---|---|
| 10 Pass Limo - 4 hours (Each additional hour charged at $150 per hour) (Beyond 30 miles, charged at $3.00 per mile) | Cemetery · Mortuary | $1,069.53 | |
| 8 Pass Limo - 4 hours (Each additional hour charged at $150 per hour) (Beyond 30 miles, charged at $3.00 per mile) | Cemetery · Mortuary | $1,024.38 | |
| Additional delivery charges to Riverside National Cemetery, Mortuary Charges | Cemetery · Mortuary | $224.55 | |
| Additional evening service, Mortuary Charges | Cemetery · Mortuary | $1,446.54 | |
| Additional Pick-Up Service: Bin | Resource Recovery & Recycling · Services | $138.50 | |
| Additional Pick-Up Service: Cart | Resource Recovery & Recycling · Services | $110.19 | |
| Administrative, Cemetery Miscellaneous Service Charges | Cemetery · Services | $172.90 | |
| Adult Grave (Double Interment), Ground Burial | Cemetery · Property | $23,937.13 | |
| Adult Grave (Double-Interment Privilege), Ground Burial | Cemetery · Property | $15,024.37 | |
| Adult Grave (Single-Interment), Ground Burial | Cemetery · Property | $15,024.37 | |
| Adult Green Burial Grave (Single-Interment), Ground Burial | Cemetery · Property | $17,313.80 | |
| Airport Billable Services | Airport · Hourly | Actual Cost | |
| Airport Event Permit | Airport · Permits | $689.94 | |
| AMI Opt-Out Meter Reading Fee (per billing cycle) | Water · Services | $27.07 | |
| AMI Opt-Out Setup | Water · Services | $111.39 | |
| Annual Lease Fee – Small Wireless Facility | Civil Engineering | $945.49 | |
| Asphalt Cement Overlay (1-1/2" - 4" thick) | Street Services · Services | $17.99 / per square footage | |
| Asphalt Cement Overlay (1/2" to 1-1/2" thick) | Street Services · Services | $79.43 / per square footage | |
| Asphalt Removal, Hauling, Replacement (over 4") | Street Services · Services | $41.83 / per square footage | |
| Asphalt Removal, Hauling, Replacement (up to 4") | Street Services · Services | $40.96 / per square footage | |
| Basic Services of Funeral Director and Staff, Mortuary Charges | Cemetery · Mortuary | $1,938.82 | |
| Bay View Columbarium Alcove) (Elevations 6,7,8) Single (B,D): Row 1 | Cemetery · Property | $4,281.93 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) (Elevations 6,7,8) Single (B,D): Row 2 | Cemetery · Property | $6,258.20 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) (Elevations 6,7,8) Single (B,D): Row 3 | Cemetery · Property | $6,587.59 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) (Elevations 6,7,8) Single (B,D): Row 4 | Cemetery · Property | $6,587.59 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) (Elevations 6,7,8) Single (B,D): Row 5 | Cemetery · Property | $6,258.20 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) (Elevations 6,7,8) Single (B,D): Row 6 | Cemetery · Property | $5,928.81 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) (Elevations 6,7,8) Single (B,D): Row 7 | Cemetery · Property | $3,458.48 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Double (L): Row 3 | Cemetery · Property | $13,833.94 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Double (L): Row 4 | Cemetery · Property | $13,833.94 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Double (L): Row 5 | Cemetery · Property | $13,175.20 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Feature (R): Row 4 | Cemetery · Property | $36,231.85 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single (H): Row 2 | Cemetery · Property | $9,716.70 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single (H): Row 3 | Cemetery · Property | $10,210.78 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single (H): Row 6 | Cemetery · Property | $9,222.63 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single Inside Corner (G): Row 2 | Cemetery · Property | $10,046.09 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single Inside Corner (G): Row 3 | Cemetery · Property | $10,540.15 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single Inside Corner (G): Row 4 | Cemetery · Property | $10,540.15 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single Inside Corner (G): Row 5 | Cemetery · Property | $10,046.09 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single Inside Corner (G): Row 6 | Cemetery · Property | $9,552 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Alcove) Wide Single Inside Corner (G): Row 7 | Cemetery · Property | $5,846.48 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry Single (A,B,C,D,E,O): Row 1 | Cemetery · Property | $4,940.68 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry Single (A,B,C,D,E,O): Row 2 | Cemetery · Property | $6,916.95 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry Single (A,B,C,D,E,O): Row 3 | Cemetery · Property | $7,246.34 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry Single (A,B,C,D,E,O): Row 4 | Cemetery · Property | $7,246.34 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry Single (A,B,C,D,E,O): Row 5 | Cemetery · Property | $6,916.95 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry Single (A,B,C,D,E,O): Row 6 | Cemetery · Property | $6,587.59 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry Single (A,B,C,D,E,O): Row 7 | Cemetery · Property | $4,117.23 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (L): Row 2 | Cemetery · Property | $13,833.94 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (L): Row 3 | Cemetery · Property | $14,492.71 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (L): Row 4 | Cemetery · Property | $14,492.71 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (L): Row 5 | Cemetery · Property | $13,833.94 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (L): Row 6 | Cemetery · Property | $13,175.20 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (M, Outside Glass Corner): Row 2 | Cemetery · Property | $15,480.86 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (M, Outside Glass Corner): Row 3 | Cemetery · Property | $16,139.62 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (M, Outside Glass Corner): Row 4 | Cemetery · Property | $16,139.62 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (M, Outside Glass Corner): Row 5 | Cemetery · Property | $15,480.86 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Double (M, Outside Glass Corner): Row 6 | Cemetery · Property | $14,822.10 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Feature (K): Row 3 | Cemetery · Property | $51,712.72 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Feature (R): Row 4 | Cemetery · Property | $37,219.97 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Single (T) Outside Glass Corner: Row 2 | Cemetery · Property | $7,740.41 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Single (T) Outside Glass Corner: Row 3 | Cemetery · Property | $8,069.80 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Single (T) Outside Glass Corner: Row 4 | Cemetery · Property | $8,069.80 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Single (T) Outside Glass Corner: Row 5 | Cemetery · Property | $7,740.41 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Single (T) Outside Glass Corner: Row 6 | Cemetery · Property | $7,411.04 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single (H,S,U): Row 1 | Cemetery · Property | $7,411.04 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single (H,S,U): Row 2 | Cemetery · Property | $10,375.47 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single (H,S,U): Row 3 | Cemetery · Property | $10,869.53 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single (H,S,U): Row 6 | Cemetery · Property | $9,881.39 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single Angle Corner (G,H): Row 1 | Cemetery · Property | $7,740.41 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single Angle Corner (G,H): Row 2 | Cemetery · Property | $10,704.85 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single Angle Corner (G,H): Row 3 | Cemetery · Property | $11,198.92 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single Angle Corner (G,H): Row 4 | Cemetery · Property | $11,198.92 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single Angle Corner (G,H): Row 5 | Cemetery · Property | $10,704.85 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single Angle Corner (G,H): Row 6 | Cemetery · Property | $10,210.78 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Entry) Wide Single Angle Corner (G,H): Row 7 | Cemetery · Property | $6,505.23 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Family Alcove) Feature (Q): Row 2 | Cemetery · Property | $29,808.92 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Family Alcove) Feature (Q): Row 3 | Cemetery · Property | $29,808.92 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Family Alcove) Feature (Q): Row 4 | Cemetery · Property | $29,808.92 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Family Alcove) Single (F): Row 1 | Cemetery · Property | $4,775.99 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Family Alcove) Single (F): Row 5 | Cemetery · Property | $4,775.99 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) (Elevations 4,9): Row 1 | Cemetery · Property | $4,611.29 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) (Elevations 4,9): Row 2 | Cemetery · Property | $6,587.59 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) (Elevations 4,9): Row 3 | Cemetery · Property | $6,916.95 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) (Elevations 4,9): Row 4 | Cemetery · Property | $6,916.95 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) (Elevations 4,9): Row 5 | Cemetery · Property | $6,587.59 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) (Elevations 4,9): Row 6 | Cemetery · Property | $6,258.20 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) (Elevations 4,9): Row 7 | Cemetery · Property | $3,787.86 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) Double (L): Row 2 | Cemetery · Property | $13,504.58 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) Double (L): Row 6 | Cemetery · Property | $12,845.80 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) Feature (N): Row 3 | Cemetery · Property | $51,383.34 | Bayview (Newly developed cremation niche spaces 2011) |
| Bay View Columbarium Vault) Wide Single (H): Row 6 | Cemetery · Property | $9,552 | Bayview (Newly developed cremation niche spaces 2011) |
| Beach Asset Damage | Public Landscape · Services | Actual Cost | |
| Beach Event Clean Up Deposit (1000+ people) | Public Landscape · Services | $1,500 Deposit $1,500 | |
| Beach Event Clean Up Deposit (150-500 people) | Public Landscape · Services | $500 Deposit $500 | |
| Beach Event Clean Up Deposit (501-1000 people) | Public Landscape · Services | $1,000 Deposit $1,000 | |
| Beach Maintenance Service | Public Landscape · Services | $145.75 / per hour | |
| Bin Washing Services | Resource Recovery & Recycling · Services | $71.88 | |
| Blanket Utility Permit: Minor Excavation up to 100 linear ft | Civil Engineering · Permits | $309.57 | |
| Blanket Utility Permit: Public Property Use up to 320 sq ft | Civil Engineering · Permits | $309.57 | |
| Bulky Item Collection (Hourly, one-hour minimum) | Resource Recovery & Recycling · Services | $253.37 | |
| Cart Rollout Services | Resource Recovery & Recycling · Services | $22.95 | |
| Certificate of Compliance | Civil Engineering · Services | $2,382.56 | |
| Chapel Fee | Cemetery · Services | $696.71 | |
| Charge for any ceremony held on weekend, Mortuary Charges | Cemetery · Mortuary | $2,308.15 | |
| Community Gardens - Annual Permit (Renewal) - Large 250 Sq Ft. and Larger1 | Office of Sustainability and the Environment | $200 | Fees for the Community Garden - Annual Permits are prorated from a flat fee based on the month the permit is initially issued as follows: a. First Quater: July - September: The amount noted on the fee schedule shall apply. b. Second Quarter: October - December: 75% of the amount noted on the fee schedule shall apply. c. Third Quarter: January - March: 50% of the amount noted on the fee schedule shall apply. d. 4th Quarter: April - June: 25 % of the amount noted on the fee schedule shall apply. Garden plots are permitted to Santa Monica residents only in accordance with conditions set forth in the Community Gardens Permit Agreement. |
| Community Gardens - Annual Permit (Renewal) - Medium(150-249 Sq. Ft.)1 | Office of Sustainability and the Environment | $150 | Fees for the Community Garden - Annual Permits are prorated from a flat fee based on the month the permit is initially issued as follows: a. First Quater: July - September: The amount noted on the fee schedule shall apply. b. Second Quarter: October - December: 75% of the amount noted on the fee schedule shall apply. c. Third Quarter: January - March: 50% of the amount noted on the fee schedule shall apply. d. 4th Quarter: April - June: 25 % of the amount noted on the fee schedule shall apply. Garden plots are permitted to Santa Monica residents only in accordance with conditions set forth in the Community Gardens Permit Agreement. |
| Community Gardens - Annual Permit (Renewal) - Small(less than 150 Sq. Ft)1 | Office of Sustainability and the Environment | $100 | Fees for the Community Garden - Annual Permits are prorated from a flat fee based on the month the permit is initially issued as follows: a. First Quater: July - September: The amount noted on the fee schedule shall apply. b. Second Quarter: October - December: 75% of the amount noted on the fee schedule shall apply. c. Third Quarter: January - March: 50% of the amount noted on the fee schedule shall apply. d. 4th Quarter: April - June: 25 % of the amount noted on the fee schedule shall apply. Garden plots are permitted to Santa Monica residents only in accordance with conditions set forth in the Community Gardens Permit Agreement. |
| Conduit Only Repair Or Relocation: per linear foot | Street Services · Services | $10.87 / per linear foot | |
| Construction & Demo Waste Management Plan Review: Medium | Resource Recovery & Recycling · Services | $702.21 | |
| Construction & Demo Project Waste Management Plan Review: Demo Only | Resource Recovery & Recycling · Services | $702.21 | |
| Construction & Demo Waste Management Plan Review: Complex | Resource Recovery & Recycling · Services | $917.67 | |
| Construction & Demo Waste Management Plan Review: Simple (SFR) | Resource Recovery & Recycling · Services | $592.45 | |
| Container Rental (Rent-A-Bin) | Resource Recovery & Recycling · Rentals | $347.67 | |
| Couch Crypt Row 1, Crypt Spaces | Cemetery · Property | $31,620.50 | |
| Couch Crypt Row 2, Crypt Spaces | Cemetery · Property | $39,855.02 | |
| Couch Crypt Row 3, Crypt Spaces | Cemetery · Property | $39,855.02 | |
| Couch Crypt Row 4, Crypt Spaces | Cemetery · Property | $31,620.50 | |
| Couch Crypt Row 5, Crypt Spaces | Cemetery · Property | $23,386 | |
| Couch Crypt Row 6, Crypt Spaces | Cemetery · Property | $21,739.09 | |
| Couch Crypt Row 7, Crypt Spaces | Cemetery · Property | $21,739.09 | |
| Crane Permit | Civil Engineering · Permits | $362.70 | Plus square footage of area needed, plus temporary no parking signs |
| Cremation Grave (Double) | Cemetery · Property | $12,351.74 | |
| Cremation Grave (Multiple Interment Privilege), Ground Burial | Cemetery · Property | $7,384.86 | |
| Cremation Grave, Single | Cemetery · Property | $7,384.86 | |
| Cremation Green Burial Grave | Cemetery | $12,613.28 | |
| Crypt (Double) Row 1, Crypt Spaces | Cemetery · Property | $31,620.50 | |
| Crypt (Double) Row 2, Crypt Spaces | Cemetery · Property | $39,855.02 | |
| Crypt (Double) Row 3, Crypt Spaces | Cemetery · Property | $39,855.02 | |
| Crypt (Double) Row 4, Crypt Spaces | Cemetery · Property | $31,620.50 | |
| Crypt (Double) Row 5 , Crypt Spaces | Cemetery · Property | $23,386 | |
| Crypt (Double) Row 6, Crypt Spaces | Cemetery · Property | $21,739.09 | |
| Crypt (Double) Row 7, Crypt Spaces | Cemetery · Property | $21,739.09 | |
| Crypt (Single) Row 1, Crypt Spaces | Cemetery · Property | $22,233.17 | |
| Crypt (Single) Row 2, Crypt Spaces | Cemetery · Property | $24,703.51 | |
| Crypt (Single) Row 3, Crypt Spaces | Cemetery · Property | $24,703.51 | |
| Crypt (Single) Row 4, Crypt Spaces | Cemetery · Property | $22,233.17 | |
| Crypt (Single) Row 5, Crypt Spaces | Cemetery · Property | $13,998.64 | |
| Crypt (Single) Row 6, Crypt Spaces | Cemetery · Property | $12,351.74 | |
| Crypt (Single) Row 7, Crypt Spaces | Cemetery · Property | $12,351.74 | |
| Cryptside Set-up/Equip., Cemetery Miscellaneous Service Charges | Cemetery · Services | $441.90 | |
| Curby Rental (2 hour minimum/4 hour maximum) | Resource Recovery & Recycling · Rentals | $239.71 | |
| Damaged Water Meter Repair | Water · Services | Actual Cost | This fee is not subject to the annual administrative revision and increase per resolution. |
| Delinquent Water Bills-Tags | Water · Fees | $77.24 | |
| Delivery of casketed remains to residence for viewing (Beyond 30 miles, charged at $3.00 per mile), Mortuary Charges | Cemetery · Mortuary | $449.14 | |
| Development Agreement Feasibility and Concept Review Fee | Civil Engineering | $424.16 | |
| Direct Cremation | Cemetery · Mortuary | $1,796.60 | This charge is for the cremation process wherein no services, ceremonies, or viewings will be held for the decedent. Also included is a minimum cremation container that meets crematory requirements. This charge does not include scattering at sea or other disposition of the cremated remains. All inclusive packages |
| Disinterment (Adult Grave), Cemetery Miscellaneous Service Charges | Cemetery · Services | $2,058.60 | |
| Disinterment (Cremation Grave), Cemetery Miscellaneous Service Charges | Cemetery · Services | $925.55 | |
| Disinterment (Crypt), Cemetery Miscellaneous Service Charges | Cemetery · Services | $1,012.36 | |
| Disinterment (Infant Grave), Cemetery Miscellaneous Service Charges | Cemetery · Services | $841.41 | |
| Disinterment (Niche), Cemetery Miscellaneous Service Charges | Cemetery · Services | $82.32 | |
| Double Sandblasting for Crypt Front, Cemetery Miscellaneous Service Charges | Cemetery · Services | $741.09 | |
| Dressing and casketing of unembalmed remains, Mortuary Charges | Cemetery · Mortuary | $316.19 | |
| Driveway Removal, Hauling, Replacement (depth to 6") | Street Services · Services | $135.26 | |
| Embalming, Mortuary Charges | Cemetery · Mortuary | $778.36 | |
| Emergency Sewage Spill Response | Water · Services | Actual Cost | This fee is not subject to the annual administrative revision and increase per resolution. |
| Endowment Care (All interment spaces), Cemetery Miscellaneous Service Charges | Cemetery · Services | 25% of the cost of the interment space. | |
| Endowment Care (Green burial graves) | Cemetery · Services | 35% of the cost of the interment space. | |
| EV User Fee | Office of Sustainability and the Environment · EV User Fee | $0.35 | |
| Event Bin Rental (Refuse, Food Waste, or Recycling - Per Bin) | Resource Recovery & Recycling · Rentals | $325.90 | |
| Event Cart Rental (Refuse, Food Waste, or Recycling - Per Cart) | Resource Recovery & Recycling · Rentals | $169.38 | |
| Event Coordination Fee (Bins or Carts) | Resource Recovery & Recycling · Services | $319.31 | |
| Event Rental / Party Truck per hour (Hourly, 2 hour minimum/4 hour maximum) | Resource Recovery & Recycling · Rentals | $299.03 | |
| Extra Refuse Bag Sales (cost of bags not included) | Resource Recovery & Recycling · Services | $61.51 | |
| Final Map | Civil Engineering · Reviews | $3,124.31 | |
| Final Map Revision | Civil Engineering · Reviews | $1,202.23 | |
| Fire Hydrant Flow Test | Water · Services | $1,076.84 | |
| Fire Hydrant Installation | Water · Services | $20,062 | |
| Fire Hydrant Relocation - new tap & killout | Water · Services | $18,287.78 | |
| Fire Service Install: 2" | Water · Services | $8,508.36 | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Fire Service Install: 3" | Water · Services | $13,775.13 | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Fire Service Install: 4" - 10" | Water · Services | $21,062.81 | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Flower Van - 4 hours (Each additional hour charged at $150 per hour) (Beyond 30 miles, charged at $3.00 per mile) | Cemetery · Mortuary | $583.38 | |
| Foreign Consulate office visit, Mortuary Charges | Cemetery · Mortuary | $449.14 | |
| Forwarding Remains to another funeral home. | Cemetery · Mortuary | $3,255.88 | This charge includes basic services of funeral director and staff, a proportionate share of overhead costs, transfer of remains to Woodlawn, securing and filing necessary certificates and permits, embalming or other preparation of remains, and delivery to Los Angeles International Airport (The permit, combo shipping unit or air tray, additional services and casket are not included). All inclusive packages |
| Fuel Flowage Fee-AVGas Fuel (dispensed at SM Airport) | Airport · Services | $0.05 | Fee will remain unchanged through December 31, 2028. |
| Fuel Flowage Fee-Jet A Fuel (dispensed at SM Airport) | Airport · Services | $0.05 | Fee will remain unchanged through December 31, 2028. |
| Full Prune >36 DSH | Public Landscape · Services | $603 | |
| Full Prune 13-18 DSH | Public Landscape · Services | $264.52 | |
| Full Prune 19-24 DSH | Public Landscape · Services | $323.34 | |
| Full Prune 25-30 DSH | Public Landscape · Services | $440.87 | |
| Full Prune 31-36 DSH | Public Landscape · Services | $529.10 | |
| Full Prune 7-12 DSH | Public Landscape · Services | $176.34 | |
| Funeral Coach (Hearse) 4 hours (Each additional hour charged at $150 per hour) (Beyond 30 miles, charged at $3.00 per mile) | Cemetery · Mortuary | $923.68 | |
| Graveside Set-up/Equip., Cemetery Miscellaneous Service Charges | Cemetery · Services | $516.82 | |
| Hangars, Land Value, Light Aircraft Covers and 22T Hangar | Airport · Applications | $2.06 | Fee will increase 3% annually. |
| Harvest repair, Mortuary Charges | Cemetery · Mortuary | $458.36 | |
| Heavenly Gate: Marble, Niches | Cemetery · Property | $2,635.02 | |
| Heavenly Gate: Marble: Large Glass, Niches | Cemetery · Property | $9,846.62 | |
| Heavenly Gate: Marble: Medium Glass, Niches | Cemetery · Property | $7,198.79 | |
| Heavenly Gate: Small Glass Top 3 Rows, Niches | Cemetery · Property | $3,723.49 | |
| Identification/viewing of un-embalmed remains (30-minutes maximum), Mortuary Charges | Cemetery · Mortuary | $260.43 | |
| Immediate Burial | Cemetery · Mortuary | $3,415.45 | This charge is for the immediate burial at the Woodlawn Cemetery or other cemetery within 30 miles of Woodlawn Cemetery wherein no services, ceremonies, or viewings will be held for the decedent. This charge does not include the price of a casket. All inclusive packages |
| Industr Waste Discharge Variance Request | Water · Services | $122.04 | |
| Industr WW Permit New Application Fee | Water · Permits | $125.50 | |
| Industr WW Permit: Class 1 | Water · Permits | $324.07 | |
| Industr WW Permit: Class 2 | Water · Permits | $1,072.96 | |
| Industr WW Permit: Class 3 | Water · Permits | $1,643.01 | |
| Industr WW Permit: Class 4 | Water · Permits | $2,233.33 | |
| Industr WW Permit: Class 5 | Water · Permits | $3,087.72 | |
| Industr WW Permit: Class 6 | Water · Permits | $5,848.86 | |
| Industr WW Permit: Class 99 | Water · Permits | $173.09 | |
| Industrial Waste Discharge | Civil Engineering · Permits | $793.88 | |
| Infant Burial | Cemetery · Services | $1,707.72 | This includes non-viewing graveside ceremony, basic services of funeral director and staff, transfer of remains to mortuary, embalming or refrigeration, dressing, cosmetics, and casketing, use of staff and/or equipment for graveside ceremony (on-site). |
| Infant Grave, Ground Burial | Cemetery · Property | $711.13 | |
| Kitchen Food Scrap Pail Sales | Resource Recovery & Recycling · Purchases | $7.52 | |
| Landing Fee | Airport · Services | $2.56 | Fee will remain unchanged through December 31, 2028. |
| Landscape & Irrigation Onsite Inspection (Comm/MU/Inst) | Water | $431.48 | Fee moved from OSE to Water |
| Landscape & Irrigation Onsite Inspection (SF/MF) | Water · Inspections | $304.95 | Fee moved from OSE to Water |
| Landscape & Irrigation Plan Check (Comm/MU/Inst) | Water | $486.63 | Fee moved from OSE to Water |
| Landscape & Irrigation Plan Check (SF/MF) | Water | $389.31 | Fee moved from OSE to Water |
| Library of Living Memories: Extra Large Glass - 35"L x 11.5"W x 15"H | Cemetery · Property | $27,128.14 | |
| Library of Living Memories: Large Glass - 22.5"L x 11.5"W x 15"H | Cemetery · Property | $9,846.62 | |
| Library of Living Memories: Medium Glass - 11"L x 11.5"W x 15"H | Cemetery · Property | $7,198.79 | |
| Library of Living Memories: Medium-Large Glass - 17"L x 11.5"W x 15"H | Cemetery · Property | $8,522.71 | |
| Library of Living Memories: Rows 1-15, Niches | Cemetery · Property | $2,635.02 | |
| Library of Living Memories: Rows 16-20 Niches | Cemetery · Property | $2,223.30 | |
| Library of Living Memories: Small Glass - 11"L x 11.5"W x 7"H | Cemetery · Property | $3,723.49 | |
| Lot Line Adjustment | Civil Engineering · Reviews | $1,660.08 | |
| Manifold Services (3 or more, 3/4% to 1" install) | Water · Services | $5,696.78 | |
| Marker Installation (Adult Grave), Cemetery Miscellaneous Service Charges | Cemetery · Services | $699.91 | |
| Marker Installation (Crypt), Cemetery Miscellaneous Service Charges | Cemetery · Services | $230.54 | |
| Marker Installation (Niche), Cemetery Miscellaneous Service Charges | Cemetery · Services | $156.42 | |
| Mausoleum P Niches: Marble | Cemetery · Property | $2,635.02 | |
| Mausoleum P Niches: Small Marble | Cemetery · Property | $1,985.88 | |
| Mausoleum U Niches: Large Glass - 23.5"L x 11.75"W x 13.75"H | Cemetery · Property | $9,846.62 | |
| Mausoleum U Niches: Large Marble | Cemetery · Property | $5,270.03 | |
| Mausoleum U Niches: Marble | Cemetery · Property | $2,635.02 | |
| Mausoleum U Niches: Medium Glass - 11.25"L x 11.75"W x 13.75"H | Cemetery · Property | $7,198.79 | |
| Mausoleum U Niches: Small Glass - 11.25"L x 11.75"W x 6.25"H | Cemetery · Property | $3,723.49 | |
| Mausoleum U Niches: Small Marble | Cemetery · Property | $1,985.88 | |
| Mausoleum V Niches: Marble Niche | Cemetery · Property | $2,635.02 | |
| Mausoleum V Niches: Small Marble Niche | Cemetery · Property | $1,985.88 | |
| Mausoleum W Niches: Small Marble Niche | Cemetery · Property | $1,985.88 | |
| Mausoleum W Niches: Large Glass - 23.5"L x 11.75"W x 13.75"H | Cemetery · Property | $9,846.62 | |
| Mausoleum W Niches: Large Marble Niche | Cemetery · Property | $5,270.03 | |
| Mausoleum W Niches: Marble Niche | Cemetery · Property | $2,635.02 | |
| Mausoleum W Niches: Medium Glass - 11.25"L x 11.75"W x 13.75"H | Cemetery · Property | $7,198.79 | |
| Mausoleum W Niches: Small Glass - 11.25"L x 11.75"W x 6.25"H | Cemetery · Property | $3,723.49 | |
| Memorial Tablet Foundation, Cemetery Miscellaneous Service Charges | Cemetery · Services | $2,799.71 | |
| Miscellaneous Reviews: Flood Hazard Letter | Civil Engineering · Reviews | $263.41 | |
| Miscellaneous Saw Cuts: per linear foot | Street Services · Services | $14.28 / per linear foot | |
| More Than Three Plan Reviews | Public Landscape · Plan Reviews | $173.48 / per hour | |
| Moved Meter | Water · Services | $190.84 | |
| Newsrack Permit: Annual Renewal | Civil Engineering · Permits | $154.37 | |
| Newsrack Permit: Impound Fee | Civil Engineering · Permits | $584.31 | |
| Newsrack Permit: New Install | Civil Engineering · Permits | $362.70 | |
| Niches (Bay View Columbarium Entry) Feature (P): Row 2 | Cemetery · Property | $28,326.71 | Bayview (Newly developed cremation niche spaces 2011) |
| Niches (Bay View Columbarium Entry) Feature (P): Row 3 | Cemetery · Property | $28,326.71 | Bayview (Newly developed cremation niche spaces 2011) |
| Niches (Bay View Columbarium Entry) Feature (P): Row 4 | Cemetery · Property | $28,326.71 | Bayview (Newly developed cremation niche spaces 2011) |
| Niches: Arbor View - Outdoor Niches, Row 1 | Cemetery · Property | $4,281.93 | |
| Niches: Arbor View - Outdoor Niches, Row 2 | Cemetery · Property | $6,258.20 | |
| Niches: Arbor View - Outdoor Niches, Row 3 | Cemetery · Property | $6,587.59 | |
| Niches: Arbor View - Outdoor Niches, Row 4 | Cemetery · Property | $6,587.59 | |
| Niches: Faith, Large Glass - 23.5" L x 11" W x 14" H | Cemetery · Property | $9,846.62 | |
| Niches: Faith, Marble | Cemetery · Property | $2,635.02 | |
| Niches: Faith, Medium Glass - 11.5" L x 11" W x 14" H | Cemetery · Property | $7,198.79 | |
| Niches: Faith, Small Glass - 11.5" L x 11" W x 6.5" H | Cemetery · Property | $3,723.49 | |
| Niches: Hope, Large Glass - 23.5" L x 11" W x 14" H | Cemetery · Property | $9,846.62 | |
| Niches: Hope, Marble | Cemetery · Property | $2,635.02 | |
| Niches: Hope, Medium Glass - 11.5" L x 11" W x 14" H | Cemetery · Property | $7,198.79 | |
| Niches: Hope, Small Glass - 11.5" L x 11" W x 6.5" H | Cemetery · Property | $3,723.49 | |
| Niches: Small Faith, Marble | Cemetery · Property | $1,985.88 | |
| Niches: Small Hope, Marble | Cemetery · Property | $1,985.88 | |
| Nicheside Set-Up/Equip., Cemetery Miscellaneous Service Charges | Cemetery · Services | $374.49 | |
| Opening and Closing (Adult Grave) per casket, Cemetery Miscellaneous Service Charges | Cemetery · Services | $1,498.65 | |
| Opening and Closing (Cremation Grave) per urn, Cemetery Miscellaneous Service Charges | Cemetery · Services | $472.05 | |
| Opening and Closing (Crypt) per casket or urn, Cemetery Miscellaneous Service Charges | Cemetery · Services | $1,128.11 | |
| Opening and Closing (Infant Grave) per casket , Cemetery Miscellaneous Service Charges | Cemetery · Services | $429.14 | |
| Opening and Closing (Niche) per urn, Cemetery Miscellaneous Service Charges | Cemetery · Services | $156.42 | |
| Other preparation of the remains, Mortuary Charges | Cemetery · Mortuary | $414.57 | |
| Outdoor Dining Inspection | Civil Engineering · Inspections | $283.66 | |
| Overnight Vehicular Parking (monthly) | Airport · Permits | $142.40 | Fee will increase 3% annually. |
| Overnight Vehicular Parking (nightly) | Airport · Permits | $14.22 | Fee will increase 3% annually. |
| Oversized marker/Upright Monument Removal Fee | Cemetery · Services | $312.15 | |
| Pacemaker removal, Mortuary Charges | Cemetery · Mortuary | $93.55 | |
| Park Asset Damage | Public Landscape · Services | Actual Cost | |
| Park Event Clean Up Deposit (1000+ people) | Public Landscape · Services | $1,500 Deposit $1,500 | |
| Park Event Clean Up Deposit (150-500 people) | Public Landscape · Services | $500 Deposit $500 | |
| Park Event Clean Up Deposit (501-1000 people) | Public Landscape · Services | $1,000 Deposit $1,000 | |
| Park Maintenance Service | Public Landscape · Services | $131.54 / per hour | |
| Parkway Removal & Hauling: per square foot | Street Services · Services | $18.48 / per square footage | |
| Permit Renewal | Civil Engineering · Permits | $187.59 | |
| Place Ashes in Existing Crypt Interment Privilege, Crypt Spaces | Cemetery · Property | $1,502.44 | |
| Place Ashes in Existing Full Size Grave (Multiple Interment Privilege), Ground Burial | Cemetery · Property | $1,365.85 | |
| Place Ashes in Existing Green Burial Plot, Ground Burial | Cemetery · Property | $1,365.85 | |
| Plan Check Review Fee - Building Permits (rounded to the nearest 1/2 hour increment) | Civil Engineering · Reviews | $284.76 | |
| Plan Check Review Fee - Including Flood Plan Review & Off-Site Permit | Civil Engineering | $347.36 | |
| Plan Review & Inspections: Construction Inspection $0 - $300k | Public Landscape · Inspections | $260.22 | Based on permit valuation/cost of construction. |
| Plan Review & Inspections: Construction Inspection $1M - $20M | Public Landscape · Inspections | $1,561.36 | Based on permit valuation/cost of construction. |
| Plan Review & Inspections: Construction Inspection $20M - up | Public Landscape · Inspections | $2,081.81 | Based on permit valuation/cost of construction |
| Plan Review & Inspections: Construction Inspection $300k - $1M | Public Landscape · Inspections | $520.45 | Based on permit valuation/cost of construction. |
| Plan Review & Inspections: Permit Renewals | Public Landscape · Permits | $130.11 | |
| Plan Review & Inspections: Permit Revisions | Public Landscape · Permits | $130.11 | |
| Plan Review & Inspections: Presubmittal Review | Public Landscape · Plan Reviews | $260.22 | |
| Plan Review & Inspections: Standard Plan Review | Public Landscape · Plan Reviews | $520.45 | |
| Precious/Cherish: Extra Large Glass - 30"L x 11.5"W x 14"H | Cemetery · Property | $23,252.69 | |
| Precious/Cherish: Large Glass - 24.5"L x 11.5"W x 14"H | Cemetery · Property | $9,846.62 | |
| Precious/Cherish: Medium Glass - 12"L x 11.5"W x 14"H | Cemetery · Property | $7,198.79 | |
| Precious/Cherish: Medium Glass - 14.5"L x 11.5"W x 14"H | Cemetery · Property | $7,446.97 | |
| Precious/Cherish: Small Glass - 14"L x 11.5"W x 7"H | Cemetery · Property | $3,723.49 | |
| Precious/Cherish:Marble, Niches | Cemetery · Property | $2,635.02 | |
| Pressure Washing Services | Resource Recovery & Recycling · Services | $217.06 | |
| Private Refuse Hauler Permit | Resource Recovery & Recycling · Permits | $609.89 | |
| Pull Box & Conduit Relocation: per linear foot | Street Services · Services | $18.79 / per linear foot | |
| Re-filing of permit or affidavit preparation, Mortuary Charges | Cemetery · Mortuary | $224.55 | |
| Receiving remains from another funeral home. | Cemetery · Mortuary | $2,596.93 | This charge includes basic services of funeral director and staff, a proportionate share of overhead costs, transfer of remains to Woodlawn, securing and filing necessary certificates and permits. (Additional services, casket, and other merchandise not included). All inclusive packages |
| Reestablish Delinquent Account | Water · Services | $77.24 | |
| Refrigeration of remains (beyond 21 days, charged an additional $22.54 per day) | Cemetery · Services | $25.30 / Per day | |
| Refrigeration of remains, Mortuary Charges | Cemetery · Mortuary | $758.98 | |
| Removal & Hauling of Abandoned Driveway | Street Services · Services | $43.46 / per square footage | |
| Removal, Hauling, Replacement: Concrete Alleys (up to 6") | Street Services · Services | $60.15 / per square footage | |
| Removal, Hauling, Replacement: Curb & Gutter | Street Services · Services | $930.84 / per lf | |
| Removal, Hauling, Replacement: Curb Only | Street Services · Services | $687.32 / per lf | |
| Removal, Hauling, Replacement: Gutter Only | Street Services · Services | $660.10 / per lf | |
| Review of Legal Easements/License Agreements | Civil Engineering · Reviews | $1,841.61 | |
| Right of Way Research / Inquiries - each hour | Civil Engineering · Reviews | $243.57 / per hour | |
| Roll out Services - Bin Truck Pullout | Resource Recovery & Recycling · Services | $161.06 | |
| Roll out Services - Crew Pullout | Resource Recovery & Recycling · Services | $139.52 | |
| Sale of Composting Bins (Santa Monica Residents Only) (50% Subsidy, Limit Two per Household) | Resource Recovery & Recycling · Purchases | $43.19 / plus bin | |
| Same Day Emer Turn-Off (after hours, holidays) | Water · Services | $333.99 | |
| Same Day Emergency Turn-Off (regular hours) | Water · Services | $179.49 | |
| Sanctuary of Devotion: Corner, Niches | Cemetery · Property | $9,379.54 | |
| Sanctuary of Devotion: Large 20 inch (Outside View), Niches | Cemetery · Property | $13,175.20 | |
| Sanctuary of Devotion: Large 23 inch, Niches | Cemetery · Property | $10,525.58 | |
| Sanctuary of Devotion: Large 26 inch (Outside View) Rows 3-5, Niches | Cemetery · Property | $20,152.33 | |
| Sanctuary of Devotion: Large 26 inch (Outside View) Rows 6-8, Niches | Cemetery · Property | $17,448.27 | |
| Sanctuary of Devotion: Medium Rows 1-6, Niches | Cemetery · Property | $6,682.98 | |
| Sanctuary of Devotion: Medium Rows 7-8, Niches | Cemetery · Property | $6,046.28 | |
| Scattering at sea (unwitnessed) | Cemetery · Services | $221.19 | |
| Sewer Cap: After Saddle Install | Water · Permits | $760.65 / plus materials | |
| Sewer Cap: At Time of Saddle Install | Water · Permits | $617.11 / plus materials | |
| Sewer Lateral Inspection/Repair | Water · Permits | $658.74 | |
| Sewer Reinspection | Water · Services | $311.71 | |
| Sewer Saddle Connection | Water · Permits | $1,185.30 | |
| Sewer Study Review | Water | $5,143.26 | |
| Sidewalk Removal, Hauling, Replacement (up to 4" thick) | Street Services · Services | $112.54 / per square footage | |
| Single Sandblasting for Crypt Front, Cemetery Miscellaneous Service Charges | Cemetery · Services | $576.40 | |
| Site Drainage - Changing Existing Pattern | Civil Engineering · Reviews | $550.05 | |
| Solid Waste Encl Plan Check: Complex (Major) | Resource Recovery & Recycling · Plan Reviews | $704.23 | |
| Solid Waste Encl Plan Check: Medium | Resource Recovery & Recycling · Plan Reviews | $589.72 | |
| Solid Waste Encl Plan Check: Simple (SFR) | Resource Recovery & Recycling · Plan Reviews | $88.45 | |
| Solid Waste Handling Fee | Resource Recovery & Recycling · Permits | $25.17 | |
| Special Care of autopsied remains, Mortuary Charges | Cemetery · Mortuary | $280.69 | |
| Storm Drain Connect of Existing Box | Water · Services | $563.17 | |
| Storm Drain Pipe Installation/Connection | Water · Services | $563.17 / per install | |
| Storm Drain Saddle Installation | Water · Services | $1,185.30 | |
| Storm Dye Test | Water · Services | $287.07 | |
| Street Improvement Inspections: non-SFR Apron, Sidewalk, Curb, Gutter, or Alley | Civil Engineering · Permits | $933.48 | |
| Street Improvement Inspections: SFR Apron, Sidewalk, Curb, Gutter, or Alley | Civil Engineering · Permits | $705.17 | |
| Street Sweeping Services | Resource Recovery & Recycling · Services | $294.47 | |
| Temporary Marker Placement | Cemetery · Services | $102.28 | |
| Temporary Water Service | Water · Services | $306.72 | |
| Tentative Map | Civil Engineering · Reviews | $1,105.97 | |
| Tentative Map Revision | Civil Engineering · Reviews | $430.82 | |
| Tie-Downs: Multi-engine Space below 12,500 lbs. | Airport · Applications | $89.34 / Monthly | Fee will increase 3% annually. |
| Tie-Downs: Single-engine Space | Airport · Applications | $59.56 / Monthly | Fee will increase 3% annually. |
| Tie-Ins Into Existing Asphalt or Concrete: per linear foot | Street Services · Services | $119.70 / per linear foot | |
| Tiebacks | Civil Engineering · Reviews | $1,516.99 | |
| Transfer of remains to funeral home (Residence removal or second attendant, add $95.00) (Beyond 30 miles, charged at $3.00 per mile), Mortuary Charges | Cemetery · Mortuary | $890.80 | |
| Transfer of remains to place of autopsy and return to funeral home (Beyond 30 miles, charged at $3.00 per mile), Mortuary Charges | Cemetery · Mortuary | $340.45 | |
| Transient Tie-Downs: Multi-engine Space: Aircraft over 12,500 lbs. | Airport · Applications | $19.38 / Plus $1.00 per one thousand pounds over $12,500 | Fee will increase 3% annually. |
| Transient Tie-Downs: Muti-engine Space below 12,500 lbs. | Airport · Permits | $19.38 / Nightly | Fee will increase 3% annually. |
| Transient Tie-Downs: Single-engine Space below 12,500 lbs. | Airport · Permits | $9.69 / Nightly | Fee will increase 3% annually. |
| Tree & Stump Removal >24 DSH Per Inch | Public Landscape · Services | $47.03 | |
| Tree & Stump Removal 0-24 DSH Per Inch | Public Landscape · Services | $35.24 | |
| Tree Planting 24" Box | Public Landscape · Services | $362 | |
| Tree Planting 36" Box | Public Landscape · Services | $892 | |
| Tree Planting 48" Box | Public Landscape · Services | $2,310 | |
| Tree Restitution - Cost Per Required Replacement 24" Box Tree | Public Landscape · Services | $848 | |
| Truck Ad Space Rental (per panel, per side, per month) | Resource Recovery & Recycling · Rentals | $283.71 / per month | |
| Underground Utility Waiver Application and Letter of Determination | Civil Engineering | $333.98 | |
| Upright Monument Foundation, Cemetery Miscellaneous Service Charges | Cemetery · Services | $1,399.84 | |
| Urban Run-Off Mitigation Onsite Inspection - per additional inspection | Civil Engineering · Inspections | $64.88 | Fee moved from OSE to Civil Engineering |
| Urban Run-Off Mitigation Onsite Inspection - per property, includes 2 inspections | Civil Engineering · Inspections | $197.90 | Fee moved from OSE to Civil Engineering |
| Urban Runoff Mitigation Plan | Civil Engineering · Reviews | $793.88 | |
| Use of Audio Visual Equipment | Cemetery · Mortuary | $612.84 | |
| Use of equipment and Staff for graveside ceremony, Mortuary Charges | Cemetery · Mortuary | $585.50 | |
| Use of Public Property Commercial | Civil Engineering · Permits | $2.94 / per day, per 100 sq ft | |
| Use of Public Property Residential | Civil Engineering · Permits | $1.81 / per day, per 100 sq ft | |
| Use of Public Property: New Permit with Transportation Review | Civil Engineering · Permits | $410.16 | Plus square footage of area needed, plus temporary no parking signs |
| Use of Public Property: New Permit without Transportation Review | Civil Engineering · Permits | $248.54 | Plus square footage of area needed, plus temporary no parking signs |
| Use of Public Property: Permit for Moving Pods | Civil Engineering · Permits | $181.84 | |
| Use of Public Property: Permit Renewal without Transportation Review | Civil Engineering · Permits | $187.59 | Plus square footage of area needed, plus temporary no parking signs |
| Use of staff for funeral ceremony, Mortuary Charges | Cemetery · Mortuary | $849.11 | |
| Use of staff for memorial service (no casket present), Mortuary Charges | Cemetery · Mortuary | $760.09 | |
| Use of staff for viewing, Mortuary Charges | Cemetery · Mortuary | $709.38 | |
| Utility Excavation Permit: 100 feet & over | Civil Engineering · Permits | $271.22 / per hour | |
| Utility Excavation Permit: up to 100 feet | Civil Engineering · Permits | $1,475.01 | |
| Wastewater Capital Facility Fee Calculation Factor, Capital Facility Fee | Water · PW Wastewater (Sewer) Capital Facility Fees | $4,589 / per EDU, plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Multi-Family Residential, Each Additional 1 Bedroom Unit | Water · PW Wastewater (Sewer) Capital Facility Fees | $2,194.51 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Multi-Family Residential, Each Additional 2 Bedroom Unit | Water · PW Wastewater (Sewer) Capital Facility Fees | $2,992.51 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Multi-Family Residential, Each Additional 3 Bedroom Unit | Water · PW Wastewater (Sewer) Capital Facility Fees | $3,790.52 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Carry Out | Water · PW Wastewater (Sewer) Capital Facility Fees | $10,719.66 / Per 1,000 Sq. Ft., plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Commercial/Industrial | Water · PW Wastewater (Sewer) Capital Facility Fees | $997.50 / Per 1,000 Sq. Ft., plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Hotel/Motel | Water · PW Wastewater (Sewer) Capital Facility Fees | $2,394.01 / Per Unit, plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Laundromats | Water · PW Wastewater (Sewer) Capital Facility Fees | $4,739.63 / Per Washing Machine, plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Office Building | Water · PW Wastewater (Sewer) Capital Facility Fees | $3,391.51 / Per 1,000 Sq. Ft., plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Restaurant - Sit Down (Full Service) | Water · PW Wastewater (Sewer) Capital Facility Fees | $1,071.97 / Per Seat, plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Retail Store | Water · PW Wastewater (Sewer) Capital Facility Fees | $997.50 / Per 1,000 Sq. Ft., plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Sit Down (Fast Food) | Water · PW Wastewater (Sewer) Capital Facility Fees | $893.31 / Per Seat, plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Non-Residential, Storage | Water · PW Wastewater (Sewer) Capital Facility Fees | $598.50 / Per 1,000 Sq. Ft., plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Single Family Residential, Add ≥4 Bedrooms to Existing Structure | Water · PW Wastewater (Sewer) Capital Facility Fees | TBD at Plan Check | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Single Family Residential, Add 1 Bedroom to Existing Structure | Water · PW Wastewater (Sewer) Capital Facility Fees | $897.75 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Single Family Residential, Add 2 Bedrooms to Existing Structure | Water · PW Wastewater (Sewer) Capital Facility Fees | $1,795.51 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Single Family Residential, Add 3 Bedrooms to Existing Structure | Water · PW Wastewater (Sewer) Capital Facility Fees | $2,693.26 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Single Family Residential, New Construction (> 3 Bedrooms) | Water · PW Wastewater (Sewer) Capital Facility Fees | TBD at Plan Check | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Single Family Residential, New Construction (1 Bedroom) | Water · PW Wastewater (Sewer) Capital Facility Fees | $2,793.01 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Single Family Residential, New Construction (2 Bedrooms) | Water · PW Wastewater (Sewer) Capital Facility Fees | $3,690.77 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Wastewater Capital Facility Fees, Single Family Residential, New Construction (3 Bedrooms) | Water · PW Wastewater (Sewer) Capital Facility Fees | $4,588.52 / plus Los Angeles ASSFC Fees | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-1 1/2" Water Meter | Water · PW Water Capital Facility Fees | $16,858 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-1" Water Meter | Water · PW Water Capital Facility Fees | $8,429 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-10" Fireline Meters | Water · PW Water Capital Facility Fees | $741,771 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-10" Water Meter | Water · PW Water Capital Facility Fees | $741,771 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-2" Fireline Meters | Water · PW Water Capital Facility Fees | $26,973 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-2" Water Meter | Water · PW Water Capital Facility Fees | $26,973 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-3" Fireline Meters | Water · PW Water Capital Facility Fees | $53,947 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-3" Water Meter | Water · PW Water Capital Facility Fees | $53,947 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-3/4" Water Meter | Water · PW Water Capital Facility Fees | $8,429 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-4" Fireline Meters | Water · PW Water Capital Facility Fees | $84,292 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-4" Water Meter | Water · PW Water Capital Facility Fees | $84,292 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-6" Fireline Meters | Water · PW Water Capital Facility Fees | $168,584 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-6" Water Meter | Water · PW Water Capital Facility Fees | $168,584 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-8" Fireline Meters | Water · PW Water Capital Facility Fees | $472,036 | This fee is not subject to the annual administrative revision and increase. |
| Water Capital Facility Fee-8" Water Meter | Water · PW Water Capital Facility Fees | $472,036 | This fee is not subject to the annual administrative revision and increase. |
| Water Inspection Fee Not Identified Elsewhere | Water · Services | $303.35 | |
| Water Meter Downsize | Water · Services | Actual Cost | This fee is not subject to the annual administrative revision and increase per resolution. |
| Water Meter Test: 3" and Over | Water · Services | $1,100.95 | |
| Water Meter Test: 3/4" - 2" Meter | Water · Services | $366.98 | |
| Water Neutrality - administrative fee - Comm/MFU 51+ units | Water · Water Neutrality | $2,861.87 | Fees are not subject to the City's established annual administrative revision and increase. |
| Water Neutrality - administrative fee - MFU 11-50 | Water · Water Neutrality | $1,902.17 | Fees are not subject to the City's established annual administrative revision and increase. |
| Water Neutrality - administrative fee - SF/MFU 1-10 | Water · Water Neutrality | $1,333.24 | Fees are not subject to the City's established annual administrative revision and increase. |
| Water Neutrality - in-lieu offset fee | Water · Water Neutrality | $0.22 / per gallon | Fee is not subject to the City's established annual administrative revision and increase. |
| Water Neutrality - performance based direct offset of add'l water - inspection | Water · Water Neutrality | $194.66 | |
| Water Neutrality - performance based direct offset of add'l water - plan check | Water · Water Neutrality | $486.64 | |
| Water Service Install: 1-1/2" Meter | Water · Services | $8,775.16 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Service Install: 1" Meter | Water · Services | $7,896.65 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Service Install: 10"+ Meter | Water · Services | Actual Cost | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. This fee is not subject to the annual administrative revision and increase per resolution. |
| Water Service Install: 2" Meter | Water · Services | $9,035.61 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Service Install: 3" Meter | Water · Services | $18,354.18 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Service Install: 3/4" Meter | Water · Services | $7,798.90 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Service Install: 3/4" to 1" Partial Upgrade | Water · Services | $947.38 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Service Install: 4" Meter | Water · Services | $19,388.99 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Service Install: 6" Meter | Water · Services | $20,309.20 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Service Install: 8" Meter | Water · Services | $30,533.92 / plus Water Capital Facility Fee | The Water Capital Facility fee is an existing system capacity fee as authorized by Municipal Code Section 7.12.090. |
| Water Study Review | Water · Report | $3,857.44 | |
| Wireless Facility Permit/6409(a) Permit Application | Civil Engineering · Permits | $1,507.64 / per location | |
| Wireless Related Permits - Outside Consultants | Civil Engineering · Permits | Actual Cost | |
| Wireless Telecommunications Construction Permit: No excavation or up to 100 Feet | Civil Engineering · Permits | $1,421.12 / per location | |
| Wireless Telecommunications Construction Permit: Over 100 feet of excavation | Civil Engineering · Permits | $248.54 / per hour,
per location | |
| Witness Marker Installation | Cemetery · Services | $156.08 | |
| Witnessed Lowering, Cemetery Miscellaneous Service Charges | Cemetery · Services | $568.15 |